Construction of a small hydroelectric power station (HPP) with an installed capacity of 2.0 MW on the Pravoberezhny main canal with a left branch in the Panfilovsky district of the Zhetysu region
Construction of a small hydroelectric power station (HPP) with an installed capacity of 2.0 MW on the Pravoberezhny main canal with a left branch in the Panfilovsky district of the Zhetysu region
The project provides for the construction of a small hydroelectric power station (HPP) with an installed capacity of 2.0 MW on the Pravoberezhny main canal with a left branch in the Panfilovsky district of the Zhetysu region. The maximum power generation capacity is 8,640,000 kWh.
- Indicator Results
- Investment amount, thousand US dollars 1 133 825
- NPV of the Project thousand, US dollars 460 948
- IRR, % 19
- EBITDA yield, %
- Payback period, years 14
- Discounted payback period, years - - 16